Clean Energy • 2023 - 2024
Koko Depot Hybrid Solar Microgrid System
Warri North LGA, Delta State•Client: Zamson Energy Ltd / Environmental Directorate
Project Overview
Installation of a 1.2 MW commercial solar photovoltaic microgrid with a 2.4 MWh lithium battery energy storage system (BESS).
The Operational Challenge
Eliminating high diesel fuel burn during continuous 24/7 gantry pumping and tank heating operations.
The Zamson Engineering Solution
Engineered industrial-grade solar canopies over depot parking lots and warehouse roofs integrated with automated grid-forming inverters.
Verified Measurable Results
Cut terminal diesel consumption by 65%, avoiding over 1,400 tonnes of CO2 emissions annually and lowering depot operating overhead.
Key Impact Metrics
Clean Generation1.2 MW Peak
BESS Storage2.4 MWh
CO2 Avoided Annually1,400 Tons
Execute Your Infrastructure With Us
Partner with Zamson Construction or Zamson Global Resources for high-stakes industrial projects.
Submit Project Inquiry