Execution Track Record
Landmark Projects & Infrastructure Case Studies
Showcasing complex midstream maritime engineering, national road tanker telematics deployments, clean solar microgrids, and civil works across Nigeria.

2022 - 2024
Maritime & Terminal
Koko Port, Delta State
Koko Marine Port Terminal Tank Farm Expansion
Turnkey expansion of coastal tank farm infrastructure, adding 45,000 MT of storage capacity and modernizing the automated manifold system.
45,000 MT
New Storage Added
500,000 hrs
Man-Hours Incident Free
-40% Time
Vessel Turnaround

2021 - Present
Transport & Logistics
36 Nigerian States (Lagos-Kano-Sokoto Axis)
Trans-Sahara Heavy Petroleum Corridor Haulage Network
Mobilization of over 750 heavy-duty trucks (including flat bodies, CNG units, and articulated petroleum tankers) with real-time GPS telematics and computerized cargo security locks.
750+ Trucks
Active Fleet Units
99.98%
Transit Cargo Integrity
36 States
National Coverage

2023 - 2024
Clean Energy
Warri North LGA, Delta State
Koko Depot Hybrid Solar Microgrid System
Installation of a 1.2 MW commercial solar photovoltaic microgrid with a 2.4 MWh lithium battery energy storage system (BESS).
1.2 MW Peak
Clean Generation
2.4 MWh
BESS Storage
1,400 Tons
CO2 Avoided Annually